Reinforcing the timber floor structures
Drainage integrated into the existing structure
Four apartments and making use of the ceiling height
Building services and execution details
Building services and execution details
Site visits were used to define the position of thermostats, air conditioning grilles,
electrical fittings, fans and bathroom equipment, and to document plumbing pressure
tests, envelope insulation and waterproofing of showers and recesses prior to tiling.
The result
The finished apartments show continuous flooring, integrated joinery and the relationship between bedrooms, kitchens and raised beds. Manuel, the client for this project, shared his feedback on Google.
Technical Specifications
Location: Calle Especerías, 7, Málaga
Programme: Four apartments
Works: Full renovation and reinforcement of the lower and upper timber floor structures
Dates: December 2024 – July 2025 (approx. 7 months)
Suppliers: Keraben, Metalcri, Aerotec and J. S. Logística de Carpintería